INDEREN was the installation company of the 1 MW biogas plant in Stracathro, Angus, Scotland (United Kingdom).
In 2017, INDEREN, subcontracted by the engineering company QILA ENERGY and under its supervision, carried out the design, control and construction work on the pipes, valves and instrumentation system of the plant. In addition, we installed all the necessary equipment for the anaerobic digestion process. The biogas plant has a capacity of 1 MW, and is located in Stracathro, United Kingdom.
Biogas Entrance to the Boiler Container
Works carried out by INDEREN
The INDEREN team carried out the following works at the Stracathro biogas plant:
Heating Container
- Design, construction, test, transport and installation of biogas boiler container
- Construction of aerial stainless steel pipes for the biogas boiler feed
- Construction of aerial carbon steel hot water pipes for exchange in the biogas boiler
Agitators Installation
- Installation of agitators in tanks
- Design and installation of all biogas pipes in the plant (aerial and buried)
- Design and installation of all substrate pipes in the Plant (aerial and buried)
- Design and installation of all hot water pipes in plant (aerial and buried, pre-insulated)
- Insulation of hot water pipes and substrates
Gasometer Installation
- Installation of gasometers in 16m and 32m diameter tanks
- Drilling on concrete tanks up to 300mm in diameter
Concrete Tank Drilling
- Supply and installation of compressed air, oxygen lines and gas analyzer
- Supply and installation of gasometer safety valves
Separators and Platform Installation
- Solid separator installation
- Electrical work of interconnection of equipment to the general control panel of the plant and connection of general panel to low voltage panel
- Manufacturing and installation of electrical panels for equipment supplied by INDEREN
Installation of Platforms and Stairs
- Design, manufacture and installation of platforms and access stairs necessary for the process in galvanized steel
- Supply and installation of pumps in sewage well
- Supply and installation of peepholes in tanks
- Supply and installation of pressure, temperature and height sensors in tanks
High Tank Level Sensor
The video about the biogas plant located in Stracathro, United Kingdom
The benefits of plant biomethanization in Stracathro, United Kingdom
- This project has gas injection into the natural gas network. After the biogas stage, the gas network is injected.
- Thermal energy is also generated, which will be used dfree of charge to municipal offices.
- They are used as raw material:
- Sweet potato remains
- Slurry
- Sewage sludge
The photos about the Stracathro plant in Angus, Scotland (United Kingdom)
Installation of Platforms and Stairs
At INDEREN we are pleased to be able to work on renewable energy projects that guarantee a more sustainable future.
We have extensive experience in the field of manufacturing, installation and commissioning of biogas plants and waste treatment plants. We also offer our customers container solutions: manufacturing of containers combining different systems according to the client’s needs (biogas, solar, industrial…). Contact us for more information.