In 2020, INDEREN participated in the construction of the biogas plant for the Metha Val de Saone project, located in Dracé, France.
In January 2020, INDEREN, subcontracted by the EnviTec Biogas engineering company and under its supervision, started the equipment assembly work in the new digester (agitators, heating system, inner tank pipes, peepholes, etc.). In addition, we installed the buried pipes of the plant, all the aerial gas pipelines made of stainless steel for the gas channelling, and the coating of the 3 concrete tanks of the plant.
The INDEREN team completed the Metha Val de Saone project in December 2020.
Works of Stainless Steel
Equipment Installation in the Tanks
Works carried out by INDEREN
The INDEREN team carried out the following works in the Metha Val de Saone biogas plant:
General View
- Construction of aerial stainless steel gas pipelines
- Installation of the biogas pipes in the plant (aerial and buried)
- Installation of the substrate pipes in the plant (aerial and buried)
- Installation of the hot water pipes in the plant (aerial and buried, pre-insulated)
- Installation of pressure, temperature and height sensors in the tanks
Buried Pipes
- Installation of water pipes
- Installation of gas cooling
- Installation of simple, tandem, central and separator platforms
- Supply and installation of stainless steel floodgates
- Supply and installation of the coating of the concrete tanks
Plataforms
The photos about the Metha Val de Saone biogas plant in Dracé, France
Equipment Installation in the Tanks
Works of Stainless Steel
General View
At INDEREN we are pleased to be able to work on renewable energy projects that guarantee a more sustainable future.
We have extensive experience in the field of manufacturing, installation and commissioning of biogas plants and waste treatment plants. We also offer our customers container solutions: manufacturing of containers combining different systems according to the client’s needs (biogas, solar, industrial…). Contact us for more information.