In 2013, INDEREN carried out the design, control and construction works of the 250 kW biogas plant in Balsa de Ves, Albacete, Spain.

250kW Biogas Plant in Balsa de Ves Albacete Spain
Read more
In 2013, INDEREN carried out the design, control and construction works of the 250 kW biogas plant in Balsa de Ves, Albacete, Spain.
In 2011, INDEREN carried out the design, control and construction works of the 500kW biogas plant in Vall d’Uixó, Castellón, Spain…
In 2011, INDEREN executed the expansion works in the 250 kW biogas plant, located in Biddinghuizen, the Netherlands…
In 2011, INDEREN executed the expansion works in the 800 kW biogas plant, located in Tjuchem, the Netherlands.
How does the process of generating biogas work?
What are the benefits of generating biogas?…